Visual Progress of the New
Perryville Branch Library
(September, 2006)
Click on the image to view a larger photo!
|
|
|
September 28 2006
Geothermal well field in progress with two drilling rigs. |
|
|
|
September 28 2006
Stormwater management pond. |
|
|
|
September 28 2006
Grading and building stakeout. |
|
|
|
|
|
September 15 2006
Trucks are continuously bringing in material for the beginnings of the foundation. |
|
|
|
September 15 2006
Groundwork for the beginning of the foundation is packed and smoothed. |
|
|
|
September 15 2006
Geothermal well drilling continues. |
|
|
|
|
|
September 7 2006
Wastewater Management site continues to be built up. Notice the cement wall in the background. |
|
|
|
September 7 2006
Geothermal well drilling in progress |
|
|
|
September 7 2006
Side view of Geothermal well drilling in action |
|
|
|
|
|
September 1 2006
Beginnings of the Storm Water Management Pond |
|
|
|
September 1 2006
Geothermal wells are located and marked |
|
|
|
September 1 2006
Preparation for drilling of the geothermal wells |
|
|
Architectural renderings:
Interior
Exterior
Photographs:
2006:
July
August September
October
November
December
2007: January
February/March
April/May
June/July
November/December
|